R.J. and his helper Bob showed up a little after 9:00 to install the egress window well, spread topsoil to establish the final grade, and resurface the driveway. First, R.J. used his backhoe to carefully excavate the pit at the basement egress window. Then we loaded the steel window well into the backhoe's bucket, and Bob held it in place as R.J. drove it to the lake side of the house. Before long the well was down in the hole, bolted to the building, and backfilled.
| Bob directs R.J. as he scrapes dirt and bowling ball-sized rocks from the egress window well pit. |
| The corrugated steel window well rides to its new home in the backhoe's bucket — with Bob holding it in place! |
| R.J. (left) drills a hole for one of the bolts which secure the well to the building, while Bob holds the unit in place. |
| The window well is backfilled. Surrounded mostly by rock, it's not going anywhere! |
| The finished window well. A ladder will make escape from a fire easier, and a cover will keep the well snow-free. |
| Part of the load of topsoil went to the street side of the house, and the rest to the south and west sides. |
| R.J. distributes and levels topsoil on the lake side. Because of the excavation, I have a lot more rocks to rake! |
Once the topsoil was spread, R.J. drove to the LaFarge plant south of Lake Esau and returned with a load of limestone "cinder." This is a byproduct of LaFarge's limestone quarrying operation and is widely used in this area as a driveway surfacing material. It starts out dry, light and fluffy, a bit like flour. However, once it has been spread, compacted by vehicular traffic, and dampened by rain, it solidifies into something like concrete.
| The load of cinder is dumped in the driveway. |
| It took R.J. about 45 minutes to spread the cinder over the driveway, enlarging the back-up area and correcting the slope for rain runoff. |