Friday, November 5, 2010

Catching Up

I'm catching up with the construction project today.  After several days downstate I'm a bit behind the curve.  The plumber did his rough-in this week and Dave wants me to look over the upstairs bath to determine how high the wall at the end of the tub should be.  The car bay doors have been installed on the garage, so that building can now provide lockable storage.  This morning I took the paperwork into PIE+G so they can put in a buried power line to replace the present overhead line.  The young lady told me that "winter" line burials (starting Nov. 1) could result in a surcharge of $2 per foot because of frost in the ground.  Ka-ching! •••